This highly complex refrigerated facility contains 5 temperature controlled zones ranging from -25°C to -18°C, ambient warehousing, 1,500m² of offices and ancillary facilities including driver sleeping quarters, workshops, truck wash and refuelling facilities.

A full “drive around” layout and dedicated light vehicle access was fundamental for the client. CIP engaged Reid Campbell to translate the highly technical brief into a detailed design package within a very tight program to enable the Rand to meet their critical “go-live” operational date.

  • STATUS:Completed
  • SIZE:22,274m²
  • VALUE:$38 Million